Not sure what's different in northern New England, but this is what I was told.
Saturday, February 27, 2010
Report from the front
Friday, February 26, 2010
Smart Grid "Customer Use Cases" comment end
But seriously, we received excellent comments, both through the Forum and via e-mail, and it looks like we'll be busy for a bit resolving them. The document is quite "dry" (even by my standards); I'm encouraged that folks took the time to study it very carefully and find issues on which to submit substantive comments.
Runoff
No results yet, but with a 4-way split I am guessing there will be another runoff.
Thursday, February 18, 2010
Smart Grid customer use cases review
But preceding that I spent a fair amount of time plowing through the almost 100-page document, EIS Alliance Customer Domain Use Cases v1.0, which is published online for review and comment. (The customer domains are Industrial, Commercial and Residential buildings -- I'm in the Commercial Buildings group.)
I've already uploaded my clearly-editorial comments, one technical comment, and one uncertain. I've circulated my comments among internal parties and the rest of the technical should be up soon, along with some of theirs.
But for all that, I still have to make to another pass through the Use Cases document, double-checking certain of the technical elements. Fortunately the review period was extended to 2/26!
Then maybe I can get back to redrafting some of my BACnet proposals...
Tuesday, February 16, 2010
Wait it out
The minutes show no task was assigned. (If only we'd had Sharon Dinges' very carefully detailed minute-taking in that meeting, over and above the call of duty!) Bernhard says his notes said, "It is moved and approved that this section is withdrawn in favor of further research on the issue. Dave Robin will do this research." Three years later, Dave guesses the research is still ongoing.
But as he asked today, "Is anyone actually making half routers these days?" Good question! The BACnet half-router was developed for joining BACnet internetworks intermittently through dial-up connections, though it also has other applications. I have long argued that BACnet evolved in the one of two possible directions in which the primary function of the half-router doesn't work, at least not without some "assistance" not defined in the standard.
And it is fairly argued that the subject matter of WS-048 soon becomes the obvious approach to anyone implementing half-routers, though the intent of WS-048 was simply to make the point obvious, not something that had to be puzzled out.
Still, it seems strange that we can just table the proposal because technology has passed it by.
IS anyone actually making half routers these days?
Conflict!
Not so with the Smart Grid Interoperability Panel (SGIP), the Smart Grid Architecture Committee (SGAC) and the Energy Information Standards Alliance (EIS Alliance), all of which come with their own meetings and teleconferences. Avoiding each other, they're landing right on top of a number of BACnet events.
Oh well. This is probably happening to a lot of folks involved in the Smart Grid effort. I'll just have to pick & choose.
Saturday, February 13, 2010
EU and NA Smart Grid development
The European effort started in advance of the American (or at least the NIST "Smart Grid Interoperability Panel," or SGIP), and though it has one difficulty not present in the American, the required coordination of many countries, it seemed to be similar in some aspects. He noted, for example, that the European effort started with 50 protocols though the number was reduced to 10 or so through a weeding process based on data rates, information throughput and other aspects. And the SGIP is starting out with roughly 90!
At some point, of course, the effort becomes political and I am minded of an SGIP colleague who said that in college he switched his studies from political science to technology because he didn't want to deal with "politics and bureaucracies." Oops -- all technical standards development seems to deal with "politics and bureaucracies."
Still, other elements of what I heard should be a concern to the SGIP. For example, the European effort reportedly started out with an aggressive schedule which subsequently had to be set back. (Details would help.)
Some European elements are different from the American: the European effort seems to be heavily centered on meters, for example: CENELEC/TC 13 for electric meters, CENELEC/TC 294 for non-electric meters including gas and water (buildings are under CENELEC/TC 205).
But Peter will supply his powerpoint slides and additional reference URLs on the European effort as addenda to the WG-Technique minutes. I look forward to seeing them.