Friday, October 29, 2010

Georgia Tech T-shirts

Apparently BACnet Chairman Dave Robin made a comment this week about attending Georgia Tech and all he go was a shirt. As a result, Coleman, Stuart, Mike and Carl bought t-shirts from the bookstore and all wore them today.

I think it was Stuart who said, "And they only cost us five dollars!"

(Thanks to Steve Karg for the photo!)

BACnet meeting - last day


Today is the last day of the autumn BACnet meeting, with a bit more than an hour to go. I was bit late due to having overslept (I hate alarms, but if I overslept I needed it -- and to tell the truth my health hasn't been the best this week).

I arrived just in time for the conclusion of discussion and vote on an Interpretation Request I'd submitted last week pursuant to a short discussion on the BACNET-L e-mail list week before last. (Note to Guillaume Girard: you will have to store both forms.) This leaves an issue on the table for a more general discussion, but that will be for another time.

It's been a good meeting, but somehow it seems that we've not accomplished as much as we could have. Perhaps that's because the comments from the just-concluded public reviews took up a lot of time.

One thing I noted yesterday -- the tables in these meeting rooms are on wheels and there are lots of power outlets on the floor. This would be a perfect facility for the North American plugfests!

Thursday, October 28, 2010

Hot off the press!

I've been watching for it for a week or two and today it became available: ASHRAE Standard 90.1-2010 (downloaded PDF):

Wednesday, October 27, 2010

Long day over

It was a long day, but I mnuddled through. And it went mostly as planned, beginning with a breakfast discussion about the Application Profiles working group, followed by 2 hours of Objects & Services (who grabbed the "ad hoc" time in order to review more comments), then the Smart Grid group.

After lunch I had a Smart Grid teleconference that pulled me away for an hour and a half, but didn't re-connect with the meetings because these were co-worker Stuart's areas and I had to get going on a powerpoint (energy talk, revised and reformatted) due next week.



Then it was pouring rain when we returned to the hotel, then off to dinner a while later. "Cocktail party effect" blasted my ears, but they're recovering already. Back in the room now, resting up for tomorrow with Objects & Services all morning, a one-hour kickoff of the restart of the Application Profiles group, and the beginning of the plenary session ending Friday noon.

Chairman Dave Robin said that ASHRAE's public review procedures have changed in ways that will help us. I will have to get details. Tomorrow.

Standards... and more standards [energy efficiency]

One of my talks these days is "Energy Standards and Energy Efficiency" (what standards say about how to save energy and money with your building automation system). It covers several ASHRAE and Green Building Institute standards, LEED and other green building rating systems, the ASHRAE Advanced Energy Design Guides and the ASHRAE Green Guide -- and nearly every strategy I've heard so far can be found in these documents.

One problem I have these days is keeping the talk up to date, not to mention adding additional sources such as the U.K. BREAAM green building system, which I gather is the "grand-daddy" of them all. (Those not available in English I have to pass over -- sadly, or maybe not because there are so many national rating systems!)

But ASHRAE recently announced the imminent publication of 90.1-2010, "Energy Standard for Buildings Except Low-Rise Residential Buildings", a major revision of the 2007 version I've referenced in earlier talks. I have approval to purchase and it's (still) due late October. It will be a scramble to incorporate it into the powerpoint due the first week of November.

Then yesterday I received a new draft circulated to my ISO technical committee, ISO/WD ("Working Draft") 16484 Part 7, "Building Automation and Control Systems — Part 7: BACS impact on the energy efficiency of buildings". (ISO 16484 Part 5 is better known as BACnet.) Could anything be more spot on? Sure, it's only a working draft and is likely to change quite a bit before it gets to publication, but I anticipate some interesting reading.

Tuesday, October 26, 2010

Busy day

It's not a good sign when a group of us BACneteers meet up for a beer (or whatever) then dinner, but none of us have much energy for anything but to get dinner and crash. And it's only been the second day of five.

But it's also been a pretty busy day. TI (Testing & Interoperation working group) polished off responses to comments on three public review addenda in only 20-some minutes (I am certain this is a record, though there were few comments submitted!) and spent the rest of the morning reviewing and revising two more addenda, containing proposed new tests for the BACnet testing standard, ASHRAE 135.1. Believe me, reviewing standardized tests is a VERY dry and exhausting process.

Not sure what was happening in LA (Lighting Applications) next door, but it sounded like they were experiencing the standards creation process to its fullest extent. (I do not have a report, but hope for white smoke.)

In the afternoon LSS (Life-Safety and Security) were extremely quiet. Not sure what they were cooking up, either, but I'm sure they'll let us in on the secret in due time.

On my side it was a death's march of working group meetings, starting with the MS/TP LAN folks and a very intriguing proposal for new work that involves other standards organizations (I am most interested, but do I have time?). This was followed by the IP (Internet Protocol) group and discussions of IPv6 and more -- though I was out of the room for much of it.

I donated time to IP from EL (Elevators working group) for them to address more work items, which worked out because we finally cleared a major hurdle with the Elevators proposal and in only 35 minutes. (Thank you very much, Christoph, for breaking the logjam!) The work ahead is all on the BACnet side of the Elevators proposal -- the elevator companies have been silent for a few months now on their review.

NS (Network Security) wrapped up the day, but I do not know what they were doing because I was busy writing up and circulating the EL-WG minutes.

If all this sounds exhausting, well, it was.

And the longest day is still ahead of us. It starts with a 7AM hotel restaurant breakfast to discuss new directions for AP (Application Profiles). Following it are meetings of LA, OS (Objects & Services), SG (Smart Grid), and IT (Information Technology) and XML (XML) working group meetings. The way the chart is drawn I'm not sure if the last two are separate or combined meetings.

And when that all wraps up, we still have ahead our traditional committee dinner (no-host) together.

All I have to do is to make it to Thursday...

Monday, October 25, 2010

Big bag of regrets

The day-long Objects and Services Working Group session has been spent reviewing public review comments already received on three addenda concluding public review: Addenda ac, ad and af. As committee chairman Dave Robin remarked this afternoon regarding the voluminous Addendum af, "This addendum is a big bag of regrets" -- stuff we would have liked to have had done back in 1995.