Sunday, January 30, 2011

Missed meetings

I had had a day full of meetings planned, but it's not working out at all as I had planned. The morning's series of IP, IT and XML working groups would have been interesting, but due to another last-minute meeting I was only able to be present for the last 15 minutes. The series was clearly of interest to many folks, especially those working on the Smart Grid -- all the chairs were taken. (This photo shows a half or so of the people.)

This afternoon will be much the same; pulled away a half-hour into the first session. But I'll have to draw the line at the BACnet Elevators working group meeting I'm conducting at 4 PM.

And sometime I hope to have enough time to gather the materials for the first of the announcements from these meetings.

Friday, January 28, 2011

Did we just miss an anniversary?

Waking up this morning (yes, it's that early and no, I'm not always thinking about things BACnet though sometimes it seems like it) I realized it's been 15 years since the introduction of BACnet to the general public at the AHR Expo of 1996 with an interoperability demonstration involving several manufacturers. I took a quick tour around BACnet.org and BACnetInternational.org and saw thing. Hm.

Maybe it's just that so many of the old guard have moved onwards and upwards.

BACnet testing, day 2

The Testing & Interoperation Working Group (TI-WG) met in the Las Vegas Conference Center to follow on the work product of the BTL-WG, reviewing and approving 5 proposed addenda (comprised mainly of tests developed within the BTL-WG) to the BACnet testing standard (135.1-2009) for review by the entire committee.

Thursday, January 27, 2011

11 years of BACnet testing

It's hard to believe how far we've since the initial launch of the BTL-WG In January 2000. Its mission: to develop a BACnet testing program to counter the FUD ("Fear, Uncertainty, Doubt") of "They say it's BACnet but is it REALLY BACnet?" With a testing program that kicked off years ago with the simplest devices and now extending to the most complex controllers and workstations, we've come a long way.

Not that we're done, by any stretch. Many of the tests we've developed are being rapidly rolled into the BACnet testing standard; others are being reviewed and revised. And we have our work cut out in merging and unifying the testing and process between the two BACnet teting labs.

The committee's numbers have never been large: today's meeting with 14 members, from Europe and North America, is pretty typical.

But today's meeting was notable for the fanciest location yet, in the Vdara Hotel & Spa in Las Vegas (a LEED Gold building) -- although this picture didn't quite capture that.

Tuesday, January 25, 2011

"Saving the Smart Grid"

I'm trying to prepare for the upcoming five days of BACnet meetings, but the Smart Grid keeps intervening. Somehow I wound up on a mailing list called "Public Utilities FORTNIGHTLY," which is a very interesting and educational look into the world of the energy utilities. This morning's issue has an article I found an interesting read, "Saving the Smart Grid: Hype, hysteria and strategic planning".

Now it's back to the BACnet Elevator proposal, scheduled for 4 PM Sunday (the Elevator and MS/TP working groups just switched meeting times a few minutes go).

Friday, January 21, 2011

"Why American utilities will overpay $2 billion for smart meters"

Thanks to today's CABA Newsbrief I saw an article with the above title (click on the title to see it all), beginning:

Why are American utilities spending twice what the Europeans do for smart meters? Why aren't they using joint standards and joint procurement to achieve economies of scale and drive down prices?

This screw-up will squander at least $2 trillion over five years. Who will foot the bill? As the old joke goes, one of three groups – ratepayers, consumers or taxpayers.

$2 billion may be understating things

Update: Francine has a great link in the comments.
An American friend working in Europe tells me the typical cost there is $40 per meter (plus $15 for the communications by the way). In America, he says, typical prices are $110 to $120 per meter (and about $50 for the communications). ...

Not 100% clear on what these "smart meters" do, other than communicate meter readings back to the utility in order to eliminate human meter readers.

One thing is clear: they're not "Smart Grid" meters. At least not the Smart Grid being developed by NIST's Smart Grid Interoperability Panel under White House direction. We are still defining the data and interfaces for residential, commercial and industrial buildings! So in a few years these meters might have to be replaced anyway.

Wednesday, January 19, 2011

The Russian Standard

Things have been pretty quiet on the BACnet front, hence the long silence. Much of my work time is being spent on updating my "Energy Standards and Energy Efficiency" talk with voluminous new source materials, as well as wrestling with Powerpoint 2003 issues. The rest of my work time is spent in way too many teleconferences -- with today's BACnet-IT call almost missed thanks to a calendar disconnect between Outlook and the cellphone. And with our state legislature now in session I'm now busy off-hours watching them and trying to keep them out of trouble. So although Andrey Golovin had sent me a proposed draft of the cover of the Russian BACnet standard, I didn't get to it until today.

I think it's pretty cool. Even if I can't read much of it (but I can read more of this than I can of the Japanese, Chinese and Korean translations -- at least I can sound out a little of the Cyrillic alphabet; the first word is very obviously "Protocol"). I think Andrey said he's bringing a copy to Las Vegas; if so I will be very interested in seeing it.