Wednesday, December 29, 2010
Back of the BAC Cave
Friday, December 24, 2010
A Merry Christmas to you all
Friday, December 17, 2010
The problem of repeated requirements...
We received a question from Vamsi Krishna noting that Clause 13.4.1.5 reads, in part:
"If both the 'Issue Confirmed Notifications' and 'Lifetime' parameters are absent, then this shall indicate a cancellation request. If the 'Lifetime' parameter is present then the 'Issue Confirmed Notifications' parameter shall be present."The question was what a device should do if only the 'Lifetime' parameter is absent. This caused a bit of discussion about whether this situation was even intended, or what should be done since it was not stated. Then Coleman noted that Clause 13.14.2 handled this:
If the 'Lifetime' parameter is not present but the 'Issue Confirmed Notifications' is present, then a value of zero (indefinite lifetime) shall be assumed for the lifetime.But when I read 13.14.2 in its entirety I noted that it also repeated the requirements of 13.4.1.5. Clearly the three sentences belong together, but having two of them appear earlier led people, myself included, to stop at the first clause with these requirements.
The author of this material was even then an experienced standards writer, so I can only assume it was a cut&paste error. But it sure caused some confusion.
Wednesday, December 8, 2010
Feedback for Analog Output objects
As I answered in part on the list, in order to implement it in the way it is done on the Binary Output object one would also need Deadband and Time_Delay properties, different from the ones already present, in order to implement a COMMAND_FAILURE-like algorithm. Not that that's a bad thing. This might be a useful type of alarm.
Some of the work of the "Alarm Summit" group might provide a way to do this fairly easily perhaps and without new properties. But that work remains in the Objects & Services group for now. It's a big step and I can understand if folks are cautious about it.
Tuesday, December 7, 2010
Catching up is hard to do
But I also missed some deadlines; in part because I couldn't work on them for a time, in part because without Outlook I didn't know the deadlines. But two of the biggest items are now done and delivered: a piece on the Smart Grid for a high-school textbook, and an article for the upcoming second edition of the BACnet International Journal.
Now I have to go dig out some statistics on BACnet testing. After that, I am more or less caught up except for what might be in those 172, nope, it's 173 now, unread e-mails.
Thursday, December 2, 2010
In the dark
The other fellow at my table had the solution: his laptop has a built-in LED to illuminate the keyboard. What a great idea.
Grid-Interop 2010
Today is the third (or for some folks the fourth) day of Grid-Interop 2010 here in Chicago. My second Grid-Interop, though I gather it's the fourth. Last year's event featured the kickoff of NIST's Smart Grid Interoperability Panel, which brought a number of new folks and organizations into the Smart Grid development effort.
The numbers keep growing: it was announced Tuesday that we now have 1750 members and 634 organizations involved, 10% from outside the U.S. It seems we have a quite significant number of members from Japan, with the possibility that in some specific areas Japan may be a little further along than the SGIP, but to at least one member from Japan I had to explain the ANSI consensus-building standards process, which includes representation by various areas of the industry -- it is easier to move faster without such a process. One hopes those a little further down the road can share their experiences that we might learn from them.
A question remains about progress, one year out from the start of the SGIP. I missed the detailed review Tuesday due to an offsite BACnet meeting, but I gather some of the "Priority Action Plan" groups (PAPs, fast-moving narrowly focused ad-hoc groups) have delivered or about to deliver their work items, which then are passed on to standards groups to handle through the standards process. Others are having a more difficult time.
Perhaps some of the difficulty lies in the ways of measuring progress. From my perspective of one small corner of the Grid, the commercial-building consumer of electricity, there has been significant progress made at least in the area of how such buildings will interoperate with the utilities ("the other side of the electric meter"). Though it seems what while I've been absent from my e-mail a new building-grid interface has been defined (to parallel the "Energy Services Interface" developed over the past year), along with a new acronym. I hope to catch up today.
But in other areas, from others' perceptions, there has been less progress. Since "Smart Grid" is not officially described in any way, many are co-opting it for different visions and products -- not all of which are necessarily different from the overall perspective the SGIP is developing, but which could be important components of it. Most of my active participation occurs today and tomorrow -- it will be interesting.